Eni is planning at least five more wells in 2012 to evaluate the upside potential of the Mamba Complex offshore Mozambique after making a second giant discovery.
The new gas discovery is at the Mamba North 1 prospect, in Area 4 Offshore Mozambique, is estimated to contain 7.5 tcf of gas in place.
This new discovery, in addition to the Mamba South discovery from October 2011, further increases the potential of the Mamba complex in the Area 4. Eni estimates that the total volume of gas in place reaches now about 30 tcf.
The Mamba North 1 discovery, located in water depths of 1,690 meters, reaches a total depth of 5,330 meters and is located approximately 23 Km north of Mamba South 1 discovery and 45 Km off the Capo Delgado coast. The discovery well encountered a total of 186 meters of gas pay in multiple high-quality Oligocene and Paleocene sands.
During the production test, the first performed at offshore Rovuma, the well produced high quality gas with flow rates, constrained by surface facilities, of about 1 million cubic meters a day and minor volumes of condensates. In a final production completion configuration, estimated gas production per well is expected to reach over 4 million cubic meters a day.
Eni is the operator of Offshore Area 4 with a 70% participating interest. Co-owners in the area are Galp Energia (10%), KOGAS (10%) and ENH (10%).

